+233 (024) 243 5900
info@gcap.org.gh

Mon - Fri
8:00am - 5:00pm

The project is located on the left bank of the Volta River downstream of the Kpong Hydroelectric Dam at Akuse. The Project lies within the Site for Cotton Project, Sogakope; an area acquired by the Government of Ghana through an Executive Instrument, EI 162 in 1975. Geographically, it lies between latitudes 6° 05.5′ North and

The President visited the Tono Irrigation Scheme as part of his Presidential Tour around the Northern Development Authority. Osei Owusu-Agyeman, the Project Coordinator of GCAP, explaining a point to the President of the Republic of Ghana.

Formation of Water User Association at Tono Irrigation Scheme