+233 (024) 243 5900
info@gcap.org.gh

Mon - Fri
8:00am - 5:00pm

The project is located on the left bank of the Volta River downstream of the Kpong Hydroelectric Dam at Akuse. The Project lies within the Site for Cotton Project, Sogakope; an area acquired by the Government of Ghana through an Executive Instrument, EI 162 in 1975. Geographically, it lies between latitudes 6° 05.5′ North and